CM Punjab Solar Panel Scheme 2025
The CM Punjab Solar Panel Scheme 2025, officially documented as the Roshan Gharana Program, has arrived Phase 3 as of August 2025. Hurled by Chief Minister Maryam Nawaz Sharif, this initiative is altering the lives of low-income relations crossways Punjab by providing free solar energy systems. Over 50,000 households have already helped, gaining individuality from high electricity bills and load shedding.
This complete guide covers the newest informs, aptness criteria, city-wise distribution agendas, and step-by-step request orders. Whether you’re in Lahore, Multan, Faisalabad, or any other Punjab district, this article ensures you have all the details to avail this life-changing opportunity.
More Read: BISP 8171 August 2025 Online Registration
Quick Information Table – CM Punjab Solar Panel Scheme 2025
Feature | Details |
Program Name | Roshan Gharana Solar Panel Scheme |
Launched By | CM Maryam Nawaz Sharif |
Start Date | August 2024 |
Current Phase | Phase 3 (August 2025) |
Target Households | 100,000 |
Systems Distributed | 50,000+ |
Assistance Amount | Fully Free (Solar Panels, Battery, Inverter, Installation) |
Application Method | Automatic Selection (via WAPDA/NADRA data) + Local Verification Teams |
Eligibility | Monthly electricity usage below 300 units, CNIC-linked bill |
What Is the CM Punjab Solar Panel Scheme 2025?
The Roshan Gharana Program is a welfare and sustainability scheme hurled in August 2024 to provide free solar vigor schemes to 100,000 low-income families in Punjab. The goal is to reduce power costs and sanction renewable vigor.
What’s Included in the Free Solar Kit?
Each approved household receives:
✔ Two 300-watt solar panels
✔ 150Ah (or higher) deep-cycle series
✔ 1.5-kilowatt inverter
✔ Whole cabling & connection
This scheme controls:
- LED lights
- Ceiling fans
- Mobile mounts
- Small applications
More Read: BISP 8171 Phase 3 August 2025
Who Qualifies for Free Solar Boards?
To be eligible, candidates must encounter these circumstances:
✅ Residential consumer (No profitable/manufacturing connections)
✅ Monthly electricity usage below 300 units
✅ Electricity bill listed under candidate’s CNIC
✅ Priority given to low-income & rural families
Phase-Wise Solar System Distribution (2024-2025)
Phase | Duration | Systems Delivered | Cities Covered |
Phase 1 | Aug – Dec 2024 | 20,000 | Lahore, Gujranwala, Rawalpindi |
Phase 2 | Jan – July 2025 | 30,000 | Multan, Bahawalpur, Faisalabad |
Phase 3 | Aug – Dec 2025 | 50,000 (Target) | Sargodha, Sahiwal, other districts |
Current Distribution Status (August 2025)
✔ Lahore & Bahawalpur – Completed
✔ Multan & Sahiwal – Ongoing Installations
✔ Faisalabad & Sargodha – Starting Soon
More Read: BISP 8171 Double Payment August 2025
How to Apply for the Solar Panel Scheme?
Unlike previous schemes, there is no direct online registering. Instead, the government is mechanically selecting receivers through:
🔹 WAPDA & NADRA data (Electricity bill & CNIC verification)
🔹 National Socio-Economic Archive (NSER)
🔹 Local verification teams (Door-to-door surveys)
What Should You Do?
- Ensure your power bill is related to your CNIC.
- Save your contact details efficient with WAPDA.
- Wait for an official SMS/call if designated.
- Collaborate with confirmation teams if they visit.
⚠ Beware of scams! No agent will ask for money—this scheme is 100% free.
Key Objectives of the Roshan Gharana Program
- Reduce Electricity Bills – Free solar supremacy cuts prearranged expenditures.
- Promote Clean Energy – Decreases dependence on relic fuels.
- Sustainable Development – Supports Punjab’s lime energy goals.
- Load Shedding Relief – Provides continuous power throughout outages.
Benefits for Eligible Families
✔ Zero electricity costs for basic wants
✔ 24/7 power backup during load peeling
✔ Improved living conditions (fans, lights, accusing)
✔ Environmentally friendly energy solution
More Read: Student T-Cash Card Online Registration and Eligibility Criteria
Active Distribution Zones – August 2025
City | Status |
Lahore | ✅ Distribution Completed |
Bahawalpur | ✅ Distribution Completed |
Multan | ⏳ Ongoing Installations |
Faisalabad | 🚀 Starting Soon |
Sargodha | 🚀 Launching in August 2025 |
Sahiwal | ⏳ Phase 3 Rollout Ongoing |
Frequently Asked Questions (FAQs)
Is the solar system really free?
Yes! The panels, battery, inverter, and connection are totally free.
What if my electricity usage exceeds 300 units?
You won’t qualify. Only homes using under 300 units/month are eligible.
Can shop owners or businesses apply?
No. Only residential consumers with CNIC-linked bills succeed.
How will I know if I’m selected?
You’ll receive an SMS/call from the government or WAPDA.
Is there an online tracking system?
Not yet. Assortments are complete via automatic data checks.
Final Thoughts
The CM Punjab Solar Panel Scheme 2025 is a game-changer for low-income families, offering free, supportable power and plummeting monetary burdens. With 50,000+ systems already installed, the management is on pathway to reach 100,000 households by December 2025.
What Should You Do Now?
✔ Check your electricity bill (ensure it’s under 300 units).
✔ Verify your CNIC-linked WAPDA linking.
✔ Stay alert for official notifications.
Don’t miss this once-in-a-lifetime chance to get free solar power for your home!
2 thoughts on “Apply Now: CM Punjab Solar Panel Scheme 2025 – August Rollout Update and Full Application Guide”